SI-MPPI

Search-Informed MPPI for Kinodynamic Motion Planning via Monte Carlo Tree Expansion

Ihab S. Mohamed Lantao Liu

Luddy School of Informatics, Computing, and Engineering, Indiana University Bloomington

Motivation

Autonomous mobile robots navigating large-scale, cluttered environments, such as warehouses, factories, hospitals, and greenhouses, must plan long, collision-free routes while respecting their motion constraints. Kinodynamic motion planning is particularly challenging because it requires coupling long-horizon decisions, such as selecting passages around obstacles, with the generation of dynamically feasible trajectories.

Existing planners involve different trade-offs. Sampling-based planners, such as Rapidly-exploring Random Trees (RRTs) and their variants, may spend substantial computation exploring task-irrelevant regions and constructing dynamically feasible local connections; graph- and lattice-based planners depend on state-space discretization or predefined motion primitives. Meanwhile, Monte Carlo Tree Search (MCTS) can adaptively explore competing long-horizon alternatives but faces large branching factors in continuous control spaces, whereas Model Predictive Path Integral (MPPI) control efficiently optimizes local trajectories under nonlinear dynamics yet remains susceptible to obstacle-induced local minima.

To address these complementary limitations, we propose Search-Informed MPPI (SI-MPPI), a kinodynamic motion planning framework that tightly integrates MCTS-based tree search with GPU-batched MPPI optimization: MCTS explores competing long-horizon routes, while MPPI generates cost-informed, dynamically feasible motion candidates that, once admitted, form the search-tree edges.

Contributions

  1. 1Unified search–optimization framework

    Rather than relying on exact boundary-value steering, predefined motion primitives, or purely random control propagation, SI-MPPI builds an asymmetric search tree from admitted MPPI-optimized motion segments, thereby coupling long-horizon global search with local nonlinear trajectory optimization.

  2. 2Bait-guided MPPI expansion

    We develop a GPU-batched expansion mechanism that optimizes finite-horizon control sequences toward multiple retained baits in parallel and incorporates adaptive bait handling, feasibility gating, and top-\(k\) selection, enabling computationally efficient, sparse, and directed tree growth in continuous state–action spaces.

  3. 3ESS-guided adaptation and backpropagation

    We leverage the effective sample size (ESS) to adapt the MPPI nominal control mean, providing informed warm starts for subsequent expansions, while cost-based backpropagation updates the tree statistics to guide global search.

Method

Key idea

The core concept of SI-MPPI is to replace the conventional expansion and default-policy simulation stages of MCTS with a unified bait-guided MPPI expansion, while retaining Upper Confidence Bound (UCB)-based selection and cost-based backpropagation. The resulting four-stage planning cycle is illustrated below and detailed in the following steps.

Diagram comparing the four stages of classical MCTS (selection, expansion, simulation, backpropagation) with the four stages of SI-MPPI (selection, bait-guided MPPI expansion, candidate admission, adaptation and backup).
Classical MCTS (top) versus the proposed SI-MPPI pipeline (bottom). Both employ UCB-based selection and terminate when the goal region is reached or the iteration budget \(I_{\max}\) is exhausted.
  1. 1Selection

    A UCB-based tree policy traverses the search tree to select an unexpanded node. Node rewards are initialized from the negative costs of their incoming MPPI segments, while the reward estimates used by UCB are min–max normalized among visited siblings to keep the exploration and exploitation terms on comparable scales.

  2. 2Bait-guided MPPI expansion

    From the selected node, \(B\) baits are distributed along a forward-oriented arc of radius \(r_b\). Adaptive bait handling retracts invalid baits and discards those that remain invalid. GPU-batched MPPI then optimizes finite-horizon control sequences toward the retained baits in parallel, generating candidate motion segments.

  3. 3Candidate admission

    The MPPI candidates generated from the selected node undergo feasibility gating for collision safety and sufficient progress. Top-\(k\) selection then retains at most \(k_b\) of the lowest-cost accepted candidates, adding their terminal states as child nodes and their motion segments as tree edges.

  4. 4Adaptation & backup

    Following candidate admission, ESS-guided switching between moment-matching and winner-step updates adapts the MPPI nominal control mean to warm-start subsequent expansions. Cost-based backpropagation then updates node rewards and visit counts along the selected tree path to guide subsequent UCB selection.

Benchmark Comparisons

We compare SI-MPPI with kinodynamic MCTS, LQR-RRT\(^{*}\) and Informed Kinodynamic RRT\(^{*}\) (IK-RRT\(^{*}\)) on four \(100\,\mathrm{m}\times 100\,\mathrm{m}\) occupancy-grid maps. All four planners succeeded in all five trials on every map.

Random Obstacle Field (Rand)

Spatially distributed clutter.

\(\mathbf{x}_{\mathrm{start}} = [10, 10, 90]^{\top}\) \(\mathbf{x}_{\mathrm{goal}} = [50, 50, 0]^{\top}\), with positions in meters and headings in degrees.

MCTSGoal reachedPath length: \(\ell_{\Gamma} = 60.13\,\mathrm{m}\)Tree nodes: \(N_{\mathrm{tree}} = 524\)
LQR-RRT\(^{*}\)Goal reachedPath length: \(\ell_{\Gamma} = 66.00\,\mathrm{m}\)Tree nodes: \(N_{\mathrm{tree}} = 3763\)
IK-RRT\(^{*}\)Goal reachedPath length: \(\ell_{\Gamma} = 58.19\,\mathrm{m}\)Tree nodes: \(N_{\mathrm{tree}} = 2707\)
SI-MPPI (Ours)Goal reachedPath length: \(\ell_{\Gamma} = 58.59\,\mathrm{m}\)Tree nodes: \(N_{\mathrm{tree}} = 84\)
Five-trial statistics on RandMean \(\pm\) std, as in Table I of the article; gray cells mark the best value on this map, while the path lengths and tree sizes under the clips are those of the runs shown.
Method\(T_{\mathrm{plan}}\,(T_{\mathrm{conv}})\) [\(\mathrm{s}\)] \(\downarrow\)\(\ell_{\Gamma}\) [\(\mathrm{m}\)] \(\downarrow\)\(\sigma_{\omega}\) [\(\mathrm{rad\,s^{-1}}\)] \(\downarrow\)\(a_{\omega,\mathrm{rms}}\) [\(\mathrm{rad\,s^{-2}}\)] \(\downarrow\)\(N_{\mathrm{tree}}\) \(\downarrow\)
MCTS\(0.32 \pm 0.24\)\(63.30 \pm 4.85\)\(0.45 \pm 0.24\)\(1.97 \pm 0.42\)\(503.40 \pm 271.24\)
LQR-RRT\(^{*}\)\(354.60 \pm 77.62\,(9.99 \pm 19.31)\)\(72.11 \pm 6.95\)\(0.89 \pm 0.06\)\(6.98 \pm 0.33\)\(3791.40 \pm 343.74\)
IK-RRT\(^{*}\)\(231.97 \pm 3.80\,(79.56 \pm 73.32)\)\(58.18 \pm 0.54\)\(0.98 \pm 0.14\)\(9.35 \pm 0.94\)\(9370.20 \pm 138.47\)
SI-MPPI (Ours)\(4.12 \pm 1.77\)\(60.62 \pm 1.23\)\(0.10 \pm 0.02\)\(0.25 \pm 0.06\)\(216.20 \pm 133.01\)

Cave Map (Cave)

Irregular, extended obstacles with multiple open regions.

\(\mathbf{x}_{\mathrm{start}} = [90, 60, -180]^{\top}\) \(\mathbf{x}_{\mathrm{goal}} = [90, 30, 0]^{\top}\), with positions in meters and headings in degrees.

MCTSGoal reachedPath length: \(\ell_{\Gamma} = 173.23\,\mathrm{m}\)Tree nodes: \(N_{\mathrm{tree}} = 1703\)
LQR-RRT\(^{*}\)Goal reachedPath length: \(\ell_{\Gamma} = 134.39\,\mathrm{m}\)Tree nodes: \(N_{\mathrm{tree}} = 3790\)
IK-RRT\(^{*}\)Goal reachedPath length: \(\ell_{\Gamma} = 117.88\,\mathrm{m}\)Tree nodes: \(N_{\mathrm{tree}} = 3525\)
SI-MPPI (Ours)Goal reachedPath length: \(\ell_{\Gamma} = 116.28\,\mathrm{m}\)Tree nodes: \(N_{\mathrm{tree}} = 340\)
Five-trial statistics on CaveMean \(\pm\) std, as in Table I of the article; gray cells mark the best value on this map, while the path lengths and tree sizes under the clips are those of the runs shown.
Method\(T_{\mathrm{plan}}\,(T_{\mathrm{conv}})\) [\(\mathrm{s}\)] \(\downarrow\)\(\ell_{\Gamma}\) [\(\mathrm{m}\)] \(\downarrow\)\(\sigma_{\omega}\) [\(\mathrm{rad\,s^{-1}}\)] \(\downarrow\)\(a_{\omega,\mathrm{rms}}\) [\(\mathrm{rad\,s^{-2}}\)] \(\downarrow\)\(N_{\mathrm{tree}}\) \(\downarrow\)
MCTS\(11.73 \pm 4.77\)\(187.76 \pm 28.07\)\(0.32 \pm 0.12\)\(1.35 \pm 0.27\)\(13191.20 \pm 5516.10\)
LQR-RRT\(^{*}\)\(250.23 \pm 10.99\,(1.33 \pm 0.20)\)\(146.17 \pm 7.87\)\(0.92 \pm 0.06\)\(7.09 \pm 0.18\)\(3762.00 \pm 30.21\)
IK-RRT\(^{*}\)\(37.45 \pm 9.43\,(31.15 \pm 9.65)\)\(119.41 \pm 4.34\)\(0.66 \pm 0.11\)\(6.03 \pm 0.74\)\(3465.60 \pm 354.50\)
SI-MPPI (Ours)\(5.48 \pm 3.27\)\(118.60 \pm 1.80\)\(0.11 \pm 0.01\)\(0.27 \pm 0.03\)\(338.40 \pm 255.27\)

Four-Moons Maze (4Moons)

Repeated concave obstacles that create local traps and alternative passages.

\(\mathbf{x}_{\mathrm{start}} = [32, 18, 45]^{\top}\) \(\mathbf{x}_{\mathrm{goal}} = [65, 70, 0]^{\top}\), with positions in meters and headings in degrees.

MCTSGoal reachedPath length: \(\ell_{\Gamma} = 221.43\,\mathrm{m}\)Tree nodes: \(N_{\mathrm{tree}} = 2525\)
LQR-RRT\(^{*}\)Goal reachedPath length: \(\ell_{\Gamma} = 123.79\,\mathrm{m}\)Tree nodes: \(N_{\mathrm{tree}} = 3672\)
IK-RRT\(^{*}\)Goal reachedPath length: \(\ell_{\Gamma} = 112.01\,\mathrm{m}\)Tree nodes: \(N_{\mathrm{tree}} = 4156\)
SI-MPPI (Ours)Goal reachedPath length: \(\ell_{\Gamma} = 105.72\,\mathrm{m}\)Tree nodes: \(N_{\mathrm{tree}} = 251\)
Five-trial statistics on 4MoonsMean \(\pm\) std, as in Table I of the article; gray cells mark the best value on this map, while the path lengths and tree sizes under the clips are those of the runs shown.
Method\(T_{\mathrm{plan}}\,(T_{\mathrm{conv}})\) [\(\mathrm{s}\)] \(\downarrow\)\(\ell_{\Gamma}\) [\(\mathrm{m}\)] \(\downarrow\)\(\sigma_{\omega}\) [\(\mathrm{rad\,s^{-1}}\)] \(\downarrow\)\(a_{\omega,\mathrm{rms}}\) [\(\mathrm{rad\,s^{-2}}\)] \(\downarrow\)\(N_{\mathrm{tree}}\) \(\downarrow\)
MCTS\(3.37 \pm 0.82\)\(209.79 \pm 17.92\)\(0.30 \pm 0.08\)\(1.46 \pm 0.08\)\(6039.80 \pm 716.24\)
LQR-RRT\(^{*}\)\(142.37 \pm 51.42\,(12.60 \pm 20.40)\)\(177.97 \pm 24.61\)\(0.96 \pm 0.02\)\(7.40 \pm 0.15\)\(2965.60 \pm 380.25\)
IK-RRT\(^{*}\)\(37.38 \pm 14.07\,(22.13 \pm 18.95)\)\(138.28 \pm 18.49\)\(0.70 \pm 0.07\)\(6.41 \pm 0.85\)\(4117.80 \pm 803.89\)
SI-MPPI (Ours)\(3.95 \pm 1.02\)\(111.69 \pm 7.57\)\(0.12 \pm 0.01\)\(0.29 \pm 0.01\)\(240.40 \pm 75.12\)

Moon-Gate Maze (MGate)

Narrow gated passages and symmetric detours.

\(\mathbf{x}_{\mathrm{start}} = [20, 50, 170]^{\top}\) \(\mathbf{x}_{\mathrm{goal}} = [75, 50, 0]^{\top}\), with positions in meters and headings in degrees.

MCTSGoal reachedPath length: \(\ell_{\Gamma} = 231.43\,\mathrm{m}\)Tree nodes: \(N_{\mathrm{tree}} = 6838\)
LQR-RRT\(^{*}\)Goal reachedPath length: \(\ell_{\Gamma} = 225.64\,\mathrm{m}\)Tree nodes: \(N_{\mathrm{tree}} = 2044\)
IK-RRT\(^{*}\)Goal reachedPath length: \(\ell_{\Gamma} = 216.38\,\mathrm{m}\)Tree nodes: \(N_{\mathrm{tree}} = 1886\)
SI-MPPI (Ours)Goal reachedPath length: \(\ell_{\Gamma} = 267.03\,\mathrm{m}\)Tree nodes: \(N_{\mathrm{tree}} = 1589\)
Five-trial statistics on MGateMean \(\pm\) std, as in Table I of the article; gray cells mark the best value on this map, while the path lengths and tree sizes under the clips are those of the runs shown.
Method\(T_{\mathrm{plan}}\,(T_{\mathrm{conv}})\) [\(\mathrm{s}\)] \(\downarrow\)\(\ell_{\Gamma}\) [\(\mathrm{m}\)] \(\downarrow\)\(\sigma_{\omega}\) [\(\mathrm{rad\,s^{-1}}\)] \(\downarrow\)\(a_{\omega,\mathrm{rms}}\) [\(\mathrm{rad\,s^{-2}}\)] \(\downarrow\)\(N_{\mathrm{tree}}\) \(\downarrow\)
MCTS\(8.45 \pm 3.23\)\(249.43 \pm 3.37\)\(0.26 \pm 0.10\)\(1.33 \pm 0.25\)\(12397.20 \pm 3786.59\)
LQR-RRT\(^{*}\)\(151.93 \pm 39.88\,(48.12 \pm 67.90)\)\(255.34 \pm 14.73\)\(0.95 \pm 0.07\)\(7.05 \pm 0.38\)\(3359.20 \pm 247.28\)
IK-RRT\(^{*}\)\(16.98 \pm 6.33\,(5.69 \pm 7.18)\)\(224.89 \pm 8.83\)\(0.80 \pm 0.04\)\(7.21 \pm 0.50\)\(1829.20 \pm 104.73\)
SI-MPPI (Ours)\(19.98 \pm 6.44\)\(264.68 \pm 5.71\)\(0.11 \pm 0.01\)\(0.28 \pm 0.03\)\(1290.40 \pm 401.26\)

Results at a Glance

Results are aggregated from the five-trial means across the four benchmark maps, with equal weight assigned to each map.

  • \(15.4\times\) smaller average search trees than kinodynamic MCTS \(N_{\mathrm{tree}}\): \(521\) vs. \(8{,}033\) nodes
  • \(21.8\%\) shorter average paths than kinodynamic MCTS \(\ell_{\Gamma}\): \(138.90\) vs. \(177.57\,\mathrm{m}\)
  • \(26.8\times\) / \(9.7\times\) lower average planning time than LQR-RRT\(^{*}\) / IK-RRT\(^{*}\) \(T_{\mathrm{plan}}\): \(8.38\,\mathrm{s}\) on average
  • \(4.8\text{--}37\times\) lower RMS angular acceleration than the baselines across all four maps \(a_{\omega,\mathrm{rms}}\): \(4.8\text{--}7.9\times\) vs. MCTS; \(22\text{--}37\times\) vs. RRT\(^{*}\)-based planners

Single-Branch Retention (\(k_b = 1\))

Reducing the branching limit \(k_b\) from its default value of \(3\) to \(1\) retains only the lowest-cost accepted candidate from each expansion, yielding a single-branch search tree. Across five trials per map, this reduces the average planning time from \(8.38\) to \(1.57\,\mathrm{s}\) and the average tree size from \(521.35\) to \(28.32\) nodes, but lowers the success rate from \(100\%\) to \(80\%\) (\(40\%\) on 4Moons and \(80\%\) on MGate), as no alternative branches remain to explore when the search encounters a dead end.

Random Obstacle Field (Rand)

Spatially distributed clutter.

\(\mathbf{x}_{\mathrm{start}} = [10, 10, 90]^{\top}\) \(\mathbf{x}_{\mathrm{goal}} = [50, 50, 0]^{\top}\), with positions in meters and headings in degrees.

SI-MPPI, \(k_b = 3\) (default)Goal reachedPath length: \(\ell_{\Gamma} = 58.59\,\mathrm{m}\)Tree nodes: \(N_{\mathrm{tree}} = 84\)
SI-MPPI, \(k_b = 1\)Goal reachedPath length: \(\ell_{\Gamma} = 59.73\,\mathrm{m}\)Tree nodes: \(N_{\mathrm{tree}} = 13\)

Cave Map (Cave)

Irregular, extended obstacles with multiple open regions.

\(\mathbf{x}_{\mathrm{start}} = [90, 60, -180]^{\top}\) \(\mathbf{x}_{\mathrm{goal}} = [90, 30, 0]^{\top}\), with positions in meters and headings in degrees.

SI-MPPI, \(k_b = 3\) (default)Goal reachedPath length: \(\ell_{\Gamma} = 116.28\,\mathrm{m}\)Tree nodes: \(N_{\mathrm{tree}} = 340\)
SI-MPPI, \(k_b = 1\)Goal reachedPath length: \(\ell_{\Gamma} = 115.13\,\mathrm{m}\)Tree nodes: \(N_{\mathrm{tree}} = 24\)

Four-Moons Maze (4Moons)

Repeated concave obstacles that create local traps and alternative passages.

\(\mathbf{x}_{\mathrm{start}} = [32, 18, 45]^{\top}\) \(\mathbf{x}_{\mathrm{goal}} = [65, 70, 0]^{\top}\), with positions in meters and headings in degrees.

SI-MPPI, \(k_b = 3\) (default)Goal reachedPath length: \(\ell_{\Gamma} = 105.72\,\mathrm{m}\)Tree nodes: \(N_{\mathrm{tree}} = 251\)
SI-MPPI, \(k_b = 1\)Goal reachedPath length: \(\ell_{\Gamma} = 119.91\,\mathrm{m}\)Tree nodes: \(N_{\mathrm{tree}} = 26\)

Moon-Gate Maze (MGate)

Narrow gated passages and symmetric detours.

\(\mathbf{x}_{\mathrm{start}} = [20, 50, 170]^{\top}\) \(\mathbf{x}_{\mathrm{goal}} = [75, 50, 0]^{\top}\), with positions in meters and headings in degrees.

SI-MPPI, \(k_b = 3\) (default)Goal reachedPath length: \(\ell_{\Gamma} = 267.03\,\mathrm{m}\)Tree nodes: \(N_{\mathrm{tree}} = 1589\)
SI-MPPI, \(k_b = 1\)Goal reachedPath length: \(\ell_{\Gamma} = 261.30\,\mathrm{m}\)Tree nodes: \(N_{\mathrm{tree}} = 53\)

Each map presents a successful \(k_b=1\) run alongside the corresponding default SI-MPPI run (\(k_b=3\)) from the benchmark comparisons above.

Additional Runs and Failure Cases

The first video (upper-left) shows SI-MPPI with winner-cost backpropagation finding a shorter path on MGate (\(\ell_{\Gamma}=219.75\,\mathrm{m}\)) than in the expected-cost run presented in the Benchmark Comparisons section (\(267.03\,\mathrm{m}\)), comparable to the baseline runs (\(216.38\text{--}231.43\,\mathrm{m}\)). The remaining three videos illustrate cases in which SI-MPPI, MCTS, and LQR-RRT\(^{*}\) fail to reach the goal within their respective iteration budgets \(I_{\max}\).

SI-MPPI (Ours)MGate, winner-cost backupGoal reachedPath length: \(\ell_{\Gamma} = 219.75\,\mathrm{m}\)Tree nodes: \(N_{\mathrm{tree}} = 861\)
SI-MPPI (Ours)MGateGoal not reachedBudget: \(I_{\max} = 800\)Tree nodes: \(N_{\mathrm{tree}} = 2207\)
MCTSCaveGoal not reachedBudget: \(I_{\max} = 18000\)Tree nodes: \(N_{\mathrm{tree}} = 18001\)
LQR-RRT\(^{*}\)MGateGoal not reachedBudget: \(I_{\max} = 5000\)Tree nodes: \(N_{\mathrm{tree}} = 1256\)

These supplementary runs are not included in the five-trial benchmark results reported in Table I of the article.

BibTeX

@misc{mohamed2026simppi,
  title  = {Search-Informed {MPPI} for Kinodynamic Motion Planning via {Monte Carlo} Tree Expansion},
  author = {Mohamed, Ihab S. and Liu, Lantao},
  year   = {2026},
  note   = {Under review}
}